If your calls drop or mobile data slows down when the power goes out, the Pakistan Telecommunication Authority (PTA) says it is looking at exactly that. The regulator inspected 226 mobile sites between 29 October and 11 November 2026, bringing the total number of sites checked in its current field-monitoring drive to more than 1,127, according to a PTA press release published on 20 November.
Where PTA looked
The latest round covered sites in Karachi, Lahore, Islamabad, Rawalpindi, Peshawar, Quetta, Gwadar, Bahawalpur, Sargodha, Mirpur, Skardu, Kharmang, Haripur, Mansehra, Charsadda and Pindi Gheb. The inspections were carried out with district administrations, local representatives and the mobile operators themselves.
What went wrong at the sites
PTA listed these main problems:
- power supply and backup redundancy issues
- faulty batteries and generators
- equipment deficiencies
- fibre-optic cable safety concerns
- other administrative and infrastructure shortcomings
Weak batteries and generators matter because a mobile tower without working backup goes off air during load-shedding, taking calls and internet in that area with it. PTA says it is pursuing corrective measures with the operators, but the press release does not name individual operators or say whether any penalties were imposed.
A growing exercise
This is the latest of several weekly or fortnightly rounds. Earlier reports put the figures at 115 sites between 30 September and 7 October, 166 between 15 and 22 October, and 184 between 22 and 28 October, when the running total passed 900. The checks come during a difficult period for internet users, after a fault in the SMW5 submarine cable slowed connections this month (https://www.justmobile.com.pk/smw5-cable-fault-update-traffic-rerouted-repair-ship-november-19/).
What you can do
If coverage or speed in your area is consistently poor, you can complain to your operator first and then to PTA through its complaint management system or the PTA app. PTA’s last broadband quality survey also found several operators missing targets (https://www.justmobile.com.pk/pta-fixed-broadband-quality-survey-q3-2026/).
Sources: PTA press release via PhoneWorld, 20 Nov 2026; PkRevenue (22-28 October round); APP (30 September-7 October round).

0 comments